Plug hole in bottom of atty
WEST VIRGINIA CODE
Hi, i am Hollie Age: 29. Hey I'm Britney I'm a stunning seductress, with a slim and sexy size body, with pert DD cup breasts and long thick chocolate brown hair
of wood into his laboratory, he found wooden plugs on the bottom of each nail hole. That evening, Attorney General Wilentz and Anthony Hauck confronted.
Description:Such request forms for which shall be provided by the secretary must be filed in writing with the secretary prior to the scheduled plugging of the well, and must include the number of the well to be plugged and the name and address of the well operator. The operator shall provide to the secretary all information it possesses concerning the geological nature of the strata and the pressure of the well, and shall remove all material from the entire diameter of the well, wall to wall; B The operator shall prepare down-hole logs for each well. The casing shall then be emptied of liquid from a point approximately one hundred feet below the lowest workable coal bed to the surface, and a vent or other device approved by the secretary shall be installed on the top of the string of casing in such a manner that it will prevent liquids and solids from entering the well but will permit ready access to the full internal diameter of the coal protection string of casing when required. The string of casing and the vent or other device approved by the secretary shall extend, when finally in place, a distance of no less than thirty inches above ground level and shall be permanently marked with the well number assigned by the secretary. If the total depth of the well is less than four thousand feet, perforations or rips are required every fifty feet from two hundred feet below the base of the lowest mineable coal bed up to one hundred feet above the uppermost workable coal bed. If no objection to the replugging of the well is filed by any such landowner or oil and gas lessee within thirty days after the filing of the application, and if the secretary determines that the method proposed for replugging the well will permit the safe mining through of such well, the secretary shall grant the application by an order authorizing the replugging of the well. After the cement plug has been securely placed in the well, the well shall be filled with cement to a point twenty feet above the lowest workable coal bed.
User Comments 4
Post a comment
Comment: